The control page shows one control's design, its test history and its deficiencies. From here a tester plans the next test and a control owner activates or retires the control.
The page shows:
- Summary: Last result, Last tested, Next test (red Overdue when it has passed) and Open deficiencies.
- Design: Type, Nature, Frequency, Key control and the number of Linked risks.
- Objective and Evidence requirements.
- Tests: every test of the control, newest first, with period, due date, tester, result and status.
- Deficiencies raised on the control.
- Attachments (for example the control narrative) and the activity history.
Plan a test of this control
- Open an active control and select Plan test.
- Set the Due date, the Sample size, the Tester and the Test procedure. The Control is already filled in.
- Select Plan test. The test appears under Tests as Planned.
See Control tests for the fields.
Activate or retire a control
- Select Activate on a draft or retired control. It becomes active and is scheduled for testing.
- Select Retire on an active or draft control and confirm. Retired controls are no longer scheduled for testing.
Statuses
| Status | Meaning | What you can do next |
|---|---|---|
| Draft | The control is designed but not in operation. | Activate, Retire, Edit |
| Active | The control operates and is tested on its frequency. | Plan test, Retire, Edit |
| Retired | The control is no longer used; no tests are scheduled. | Activate |
Differences by role
- Permission:
compliance.control.testshows Plan test. - Permission:
compliance.control.manageshows Activate, Retire and Edit.