Appearance
Quality hold and rejection
Also known as
- quarantine
- QC hold
- quality hold
- incoming inspection
- receiving inspection
- goods inward inspection
- reject
- rejection
- NCR
- non-conformance
When a supplier delivers an item that has a receiving inspection plan, Roari ERP does not put the goods on the shelf straight away: Inventory books them into the quarantine location, Quality opens a held inspection, and only the inspection's disposition releases or rejects the stock. A rejected delivery raises a non-conformance report (NCR) against the vendor, and Procurement shows it on the vendor's scorecard.
Who is involved
| Order | Role | Demo user | What they do |
|---|---|---|---|
| 1 | Warehouse | warehouse (Walter Wells) | Records the goods receipt, inspects the sample, decides the disposition (the demo warehouse role holds the quality permissions) |
| 2 | Quality inspector or manager | – | In a larger organisation: inspects, dispositions and works the NCR |
| 3 | Purchasing | buyer (Bruno Baker) | Follows up with the supplier from the vendor scorecard |
| 4 | Finance | finance (Fiona Finch) | Sees the receipt valued into inventory; nothing else posts |
Before you start
The hold only happens for items with an active receiving plan in Inspection plans (plan type Receiving). In the demo, CP-CASTER-LOCK has the plan IP-CP-CASTER-LOCK: wheel diameter 50 ± 0.5 mm measured on 5 units, and a pass/fail check of the lock function. Items without a plan are received straight to stock (see Procure to pay).
The process at a glance
| Step | Module | Document | Stock | Ledger |
|---|---|---|---|---|
| 1. Delivery received | Inventory | Goods receipt GRN-2026-… | In QUAR (held, not available) | Dr Inventory / Cr GRNI |
| 2. Inspection opened | Quality | Inspection INS-2026-… (Pending) | – | – |
| 3. Readings recorded, inspection fails | Quality | Inspection (Inspected, result Fail) | – | – |
| 4. Rejected | Quality, Inventory | Inspection (Dispositioned), NCR NCR-2026-… | QUAR → REJ | Nothing |
| 5. Vendor follow-up | Quality, Procurement | Supplier quality, vendor scorecard | – | – |
1. Receive the delivery
As Warehouse:
- Go to InventoryGoods receiptsNew goods receipt (or receive from the purchase order in Procurement).
- Choose the Warehouse and the Vendor, and type the supplier's delivery note number in Reference.
- In Lines, choose the Item and type the Quantity and Unit cost.
- Select Receive goods.
The receipt gets its GRN- number. Because the item has a receiving plan, the goods go to the quarantine location QUAR and Quality opens a held receiving inspection for the vendor.
Posts when you select Receive goods
| Account | Debit | Credit |
|---|---|---|
| Inventory | ✓ | |
| GRNI (goods received not invoiced) | ✓ |
The receipt is valued into inventory even while the stock is held: quarantine is a location, not a separate account.
Check the quarantine
In InventoryStock, open the item's row. The stock drawer shows the quantity as Held, and the By location tab lists it in QUAR. Held stock is not available for reservations, picking or production.
2. Inspect the sample
As the inspector:
- Go to QualityInspections. Filter on held inspections to see what waits in quarantine.
- Open the inspection. The banner reads "The stock is held in quarantine at MAIN / QUAR until this inspection is dispositioned." and Source names the goods receipt.
- Under Characteristics, type each Reading of the measured characteristic (5 for the wheel diameter) and choose Pass or Fail for each pass/fail check. Readings outside the limits are marked in red.
- Select Complete inspection.
The inspection moves to Inspected; with a defect above what the plan accepts, the result is Fail and the toast reads "INS-… failed". Use Save results to keep readings without completing.
3. Decide the disposition
On the failed inspection, select Disposition. The dialog reads "The inspection failed. Decide what happens to the 6 × CP-CASTER-LOCK."
Choose what happens to the stock:
Disposition What it does Accept Release the stock from quarantine to storage (only for a passed inspection: "A failed inspection cannot be accepted.") Reject Move the rejected quantity to the reject location (or scrap it); the rest is released Rework Keep the stock in quarantine and create a re-inspection after rework Use as is Release despite the failure (concession; you must explain why in the notes) For Reject, leave Rejected quantity empty to reject everything, or type part of it. Tick Scrap the rejected stock to write it off with a quality reject adjustment instead of moving it to
REJ.Keep Raise a non-conformance report ticked.
Select Apply disposition.
The inspection moves to Dispositioned, the Disposition section shows Moved to reject (for example 6 EA → REJ), and the NCR field links the new NCR- report.
Nothing posts for the move
Moving stock from QUAR to REJ is a move between two locations of the same warehouse: no journal entry. The receipt's entry stays as it is. Only Scrap the rejected stock posts a write-off (a stock adjustment: Dr Loss / Cr Inventory).
4. Work the non-conformance
- Select the
NCR-link on the inspection. The NCR carries the vendor, the item, the Quantity affected and its source inspection. - Record the Containment actions, choose the NCR Disposition (Use as is, Rework, Repair, Scrap, Return to vendor, Regrade) and the Cost of non-conformance.
- Select Submit disposition. When an approval rule applies, the NCR waits in Approval; otherwise it is Approved.
- If the problem needs a root-cause fix, select Raise CAPA.
- When the disposition is carried out (for example the goods went back to the supplier), select Close NCR.
⚑ Approval
In the demo, the rule Critical NCR dispositions sends dispositions of NCRs with severity Critical to the account admin. The approver acts in Approvals; until then the NCR shows "The disposition is waiting for approval. You can recall it to make changes."
5. Follow up with the supplier
- In QualitySupplier quality, open the vendor: the failed inspection and the NCR count in its quality history.
- As Purchasing, open the vendor in ProcurementVendors. The Scorecard tab counts the inspected and Rejected quantities and the reject percentage; the Quality tab lists the inspections.
Check the result
| Where | What you see |
|---|---|
| Inspection | Dispositioned, result Fail, the move to REJ and the NCR |
| Stock | The units in REJ, still Held |
| Movements | The receipt into QUAR and the move to REJ, linked to the inspection |
| Non-conformances | The open NCR for the vendor |
| Vendor | Scorecard and Quality tabs |
| Journal entries | Only the receipt's entry (Dr Inventory / Cr GRNI) |
Variants
| Situation | What changes |
|---|---|
| Inspection passes | Disposition → Accept releases the stock from QUAR to storage; it becomes available. |
| Part of the delivery is bad | Reject with a Rejected quantity; the rest is released. |
| Supplier can fix it | Rework keeps the stock in quarantine and creates a re-inspection. |
| Production needs it now | Use as is (concession) releases it with a written reason and an NCR. |
| Goods go back to the supplier | NCR disposition Return to vendor; the bill for the rejected quantity should not be paid (see the three-way match in Procure to pay). |
| In-process or final inspection | Plans of type In-process or Final hold work-order output in the same way (see Plan to produce). |
Related
- Quality: Inspections, Inspection plans, Non-conformances, CAPA, Supplier quality
- Inventory: Goods receipts, Stock, Warehouses (quarantine and reject locations), Movements
- Procurement: Purchase orders, Vendors
- Finance: Journal entries
- Features: Documents and their states, Approvals workflow, Attachments, Audit trail and activity
- Other processes: Procure to pay, Plan to produce
