Appearance
Plan to produce
Also known as
- MRP
- material requirements planning
- forecast
- demand planning
- planned order
- work order
- WO
- production order
- manufacturing order
- shop floor
Plan to produce is the manufacturing cycle from a demand forecast to finished goods on the shelf. Supply chain forecasts the demand, Manufacturing runs MRP to plan make and buy orders, releases a work order, issues the materials and records the operations on the shop-floor terminal, Inventory receives the output, and Finance values every step through work in progress (WIP). Planning then shows the load against capacity in S&OP.
Who is involved
| Order | Role | Demo user | What they do |
|---|---|---|---|
| 1 | Demand planner | admin | Runs the forecast and overrides a month where the plan differs |
| 2 | Production planner | admin (or Warehouse, which holds the manufacturing permissions in the demo) | Runs MRP, firms and converts planned orders, releases the work order |
| 3 | Store keeper | Warehouse | Issues the materials to the work order |
| 4 | Operator | shop-floor user | Starts, stops and reports each operation on the terminal |
| 5 | Planner / finance | admin, Finance | Reviews costs and variance, capacity and the S&OP plan |
The demo runs this flow as the account admin, who sees every module.
The process at a glance
| Step | Module | Document | Number | Ledger |
|---|---|---|---|---|
| 1. Forecast and override | Supply chain | Forecast run | FCR-2026-… | – |
| 2. MRP plans the supply | Manufacturing | MRP run, planned orders | MRP-2026-… | – |
| 3. Planned order converted | Manufacturing | Work order (Planned) | WO-2026-… | – |
| 4. Released and materials issued | Manufacturing, Inventory | Work order (In progress), issue movements | Dr WIP / Cr Inventory | |
| 5. Operations reported | Manufacturing | Operation time | Dr WIP / Cr Labour absorption | |
| 6. Output received, completed | Manufacturing, Inventory | Output receipt, production movement | Dr Inventory / Cr WIP, variance | |
| 7. Capacity and S&OP | Manufacturing, Planning | S&OP plan | SOP-2026-… | – |
1. Forecast the demand
Go to Supply chainDemand forecasts and open Runs. Select New forecast run.
In the wizard, choose the Warehouses and Items to forecast (leave them empty for everything), select Next twice to check the method and the scope, then select Run forecast.
The run
FCR-…opens with the series it produced.The forecast run. Open the item's forecast and select Override for the month you want to change (for example Override Nov 2026). Enter the Forecast quantity and a Reason, then select Save override.
The toast reads "Forecast for Nov 2026 overridden"; the override replaces the statistical figure for that month.
2. Run MRP
- Go to ManufacturingMRP (the MRP workbench).
- Check the Run parameters: Horizon (days), Warehouses, Include open sales orders, Include forecasts (supply chain forecasts when that module is enabled) and Keep safety stock. Add Notes.
- Select Run MRP. The run opens with the tabs Planned orders, Exceptions and Items.
- On Items, search for the item and select it to open Pegging of …: each demand line (for example Forecast Nov 2026, a Sales order) and the supply that covers it.
3. Firm and convert the planned order
- On Planned orders, search for the item. Each row shows Make / buy, Start, Due and the Demand it answers.
- Select Firm on the row, adjust the Quantity (and dates) in Firm planned order for …, and select Firm. The toast reads "Planned order firmed."
- Tick the row and select Convert.
Make orders become work orders (toast "Converted 1: WO-…", the row links to it); buy orders become purchase requisitions in Procurement (see Procure to pay). The work order starts in Planned, with Source the MRP run.
4. Release and issue materials
- Open the work order in ManufacturingWork orders and select Release. It moves to Released ("… released to the shop floor.").
- On the Materials tab, select Issue remaining materials (or Issue material per line, choosing the lot when needed). The work order moves to In progress.
Materials flagged Backflush are issued automatically when operations and output are reported.
Posts when materials are issued
| Account | Debit | Credit |
|---|---|---|
| WIP (work in progress) | ✓ | |
| Inventory (raw materials and components) | ✓ |
5. Report the operations on the shop floor
As the operator, at ManufacturingShop-floor terminal:
- Scan or type the operation code in Scan code (for example
WO-2026-00028/10) and select Find, or pick the operation from the Queue. - Select Start when work begins and Stop when it ends.
- In Stop and report, enter the Good quantity (and scrap), keep Complete the operation on, and select Stop and report.
- Repeat for the next operation. On the last one the terminal reminds you: "Last operation: receive the finished output when you are done."
Posts when time is reported
| Account | Debit | Credit |
|---|---|---|
| WIP (work in progress) | ✓ | |
| Labour absorption | ✓ |
6. Receive the output and complete
- On the work order's Output tab, select Receive output.
- Enter the Quantity, keep Complete the work order after this receipt ticked, and select Receive into stock.
The finished goods are on hand, the work order moves to Completed, and the Costs tab shows Standard, Actual and Variance (posted) per cost element (material, labour, overhead, subcontract) with every posting. Completing closes open operations, releases remaining reservations and posts the difference between actual cost and output at standard as the production variance; WIP of the order nets to zero. Select Close when nothing more will be booked.
Posts when output is received and the order is completed
| Account | Debit | Credit |
|---|---|---|
| Inventory (finished goods, at standard cost) | ✓ | |
| WIP (work in progress) | ✓ | |
| Manufacturing variance (unfavourable) or WIP (favourable) | ✓ | ✓ |
7. Check capacity and S&OP
- ManufacturingCapacity shows the load of each work centre, including the scheduled operations.
Work-centre load in Manufacturing > Capacity. In PlanningS&OP, select New S&OP plan, give it a Name and select New S&OP plan. A plan created while Manufacturing and Sales are enabled reads Capacity from work centres and Demand from sales shipments, and shows capacity per product family next to demand and supply.
Check the result
| Where | What you see |
|---|---|
| Work order | Stage rail at Completed; Materials, Operations, Output, Costs |
| Stock | On hand increased by the produced quantity |
| Movements | Issue and production movements; the Document column links the work order |
| Journal entries | Issue, labour, output and variance entries, all with the work order as source |
| Capacity, S&OP | Load against capacity |
Variants
| Situation | What changes |
|---|---|
| Make to order | Leave forecasts out; MRP plans from open sales orders (Include open sales orders). |
| Components short | MRP plans buy orders; Convert creates purchase requisitions. Missing stock shows on Exceptions. |
| Work order without MRP | Create it in ManufacturingWork ordersNew work order and tick Release immediately. |
| In-process or final inspection | With a quality plan on the operation or item, the terminal shows "An earlier operation is on quality hold." until Quality releases it (see Quality hold and rejection). |
| Lot-tracked output | Output lot number defaults to the work order number. |
| Nightly planning | Run MRP every night in MRP and scheduling. |
| Cancel | Cancel order releases the material reservations. |
Related
- Supply chain: Demand forecasts, Runs, Forecast accuracy
- Manufacturing: MRP, Work orders, Shop-floor terminal, Bills of materials, Routings, Work centres, Capacity, Costing
- Inventory: Stock, Movements
- Planning: S&OP, Product families
- Finance: Journal entries, Account mapping
- Features: Documents and their states, Numbering sequences, Dashboards and KPIs, Keyboard shortcuts reference
- Other processes: Procure to pay, Order to cash, Quality hold and rejection