Appearance
Transport and cross-docking
Supply chainSettingsTransport and cross-dockingPermission:
supply_chain.settings.viewOpen in Roari ERP (new tab)Also known as
- transport settings
- DRP horizon
- default unit weight
- cross-dock settings
- auto cross-dock
- flag backorders
- shipping location
- freight weight
- logistics settings
- إعدادات النقل
These settings set the default DRP horizon, the unit weight used when an item has none, and how receipts are flagged and moved for cross-docking. A logistics lead or administrator sets them.
Change the transport settings
You need Permission: supply_chain.settings.manage.
- Open Supply chainSettingsTransport and cross-docking.
- Change the fields below.
- Select Save settings.
| Field | What it does | Default |
|---|---|---|
| DRP horizon (days) | Proposed horizon when you run DRP. | 56 |
| Default unit weight (kg) | Used for freight estimates and landed cost by weight when an item has no weight. | 1 |
| Flag received lines with open sales order backorders for cross-docking | On: every received goods receipt is checked against open backorders and matching lines appear on Cross-docking. | On |
| Move flagged lines to the shipping location automatically | On: flagged lines move to shipping at once, without someone selecting Move to shipping. | Off |
Set item weights in HS codes & origin or in the item catalogue so that freight is estimated correctly.
