Appearance
DRP network
Also known as
- DRP network
- distribution network
- lane
- replenishment lane
- source warehouse
- supplying warehouse
- transfer lead time
- minimum transfer quantity
- hub and spoke
- multi-echelon
The DRP network defines which warehouse replenishes which: one lane per source → destination pair, with the transfer lead time, a minimum quantity and a priority. DRP plans transfers only along active lanes. Supply planners set it up before the first DRP run.
Add a lane
You need Permission: supply_chain.drp.manage.
- Open Supply chainSettingsDRP network (or select Manage network on the DRP page).
- Select New lane.
- Fill in the fields and select Save.
The message Lane … → … saved appears.
| Field | What to enter | Required / default |
|---|---|---|
| Source warehouse | The warehouse that supplies. | Required |
| Destination warehouse | The warehouse to replenish. Must differ from the source (Must differ from the source warehouse). | Required |
| Lead time | Days from dispatch to arrival, 0–365. DRP ships this many days before the need date. | Required |
| Priority | 0–99; when a destination has several lanes, the lowest number wins. | Required |
| Minimum quantity | The smallest transfer worth sending; planned transfers are rounded up to it. | Optional |
| Active | Off to stop planning along the lane. | On |
| Notes | Transport mode, cut-off day. | Optional |
Both warehouses must belong to the same legal entity: inventory transfers do not cross entities.
Edit or delete a lane
Select Edit lane or Delete lane on the row. After deleting, DRP stops planning transfers along that lane; planned transfers already proposed stay until converted or cancelled.
