Appearance
General
Also known as
- quality settings
- receiving inspection
- hold receipts
- quarantine
- auto NCR
- scrap rejects
- CAPA required
- NCR due days
- calibration alert
- document review interval
The general quality settings switch receiving inspection on, set what happens on rejects, the default due dates of NCRs and CAPAs, alert windows and the KPI window. A quality manager sets them.
Change the settings
- Open QualitySettingsGeneral.
- Change the values below. Unsaved changes shows until you save.
- Select Save changes (or Discard). Quality settings saved appears.
| Setting | Effect | Demo value |
|---|---|---|
| Hold receipts for inspection | Goods receipts of items with an active receiving plan go to quarantine until dispositioned. | On |
| Raise an NCR on reject | Reject, rework and use-as-is dispositions raise an NCR. | On |
| Scrap rejected stock by default | Rejected stock is written off instead of moved to the reject location. | Off |
| NCR due after (days) | Default due date of a new NCR. | 30 |
| CAPA due after (days) | Default due date of a new CAPA. | 60 |
| CAPA required for | NCR severities that need a CAPA before closing. | Major, Critical |
| Calibration alert (days) | Warn this many days before an instrument is due. | 30 |
| Document review interval (months) | Default review interval of controlled documents. | 12 |
| KPI window (days) | Window of first-pass yield and reject rate. | 90 |
| Default chart | X-bar / R or Individuals on SPC charts. | X-bar / R |
Under More, links lead to Approval rules (NCRs, CAPAs, document revisions) and Import and export (inspection plans and instruments).
Receiving inspection affects stock
With Hold receipts for inspection on, matching receipts are not available until an inspector dispositions them. Make sure inspectors are notified and working before you turn it on. See Quality hold.
Differences by role
- Everyone with Permission:
quality.settings.viewcan read the settings; changing them needsPermission:quality.settings.manage.
