Appearance
Bills of materials
Also known as
- BOM
- recipe
- formula
- components
- multi-level BOM
- product structure
- parts list
- phantom
- by-products
- BOM versions
A bill of materials (BOM) lists the components and quantities that make one item, the routing that makes it and any by-products. Each item can have several numbered versions over time; one is active on any date. Engineers and production planners maintain BOMs here.
Find a BOM
- Open ManufacturingBills of materials.
- Search by item code or name, or select Filters: Status, Type, Configurable, With by-products, With phantoms, Effective from.
- Select a row to open the BOM.
The list shows the Item, Version, Status, Type (Standard or Formula (process)), Effective from, Effective to, Routing, the number of Components, the ECO that created the version and when it was Updated.
Statuses
| Status | Meaning | What you can do next |
|---|---|---|
| Draft | Being prepared. Components and by-products can change. | Save, activate, delete, make obsolete. |
| Active | Used by new work orders, MRP and cost roll-ups from its effective date. The structure is read-only. | Create a new version, make obsolete, create a work order. |
| Obsolete | No longer used by new work orders or MRP. Open work orders keep their materials. | Read-only. |
To change an active BOM, create a New version (a draft copy) or raise an engineering change order when changes need approval.
Create a BOM
Select New BOM (needs Permission: manufacturing.bom.manage) and follow Bill of materials. BOMs can also be imported, one row per component, from Import and export.
