Appearance
Change order
Also known as
- new ECO
- engineering change order
- ECN
- ECR
- change request
- affected BOMs
- submit for approval
- revise
- effective date
- BOM revision
On the change order page you describe the change, list the BOMs it affects with the component changes for each, and submit it for approval. Approval creates a new version of every affected BOM.
Raise a change order
- Open ManufacturingChange orders and select New change order, or press CtrlK and type
new engineering change order. - Under Change request, enter the Title, Priority, Effective date (the new BOM versions apply from this date), the Reason and a Description.
- Under Affected BOMs, select Add affected BOM and choose the BOM. Open Current components (…) to see what it has today.
- Under Changes to …, select Add change for each change:
- Add: a new Component with its New qty (and New scrap %, Phantom).
- Update: an existing component with a new quantity, scrap or phantom flag; leave a field Unchanged to keep it.
- Remove: an existing component.
- Repeat for every BOM the change affects (use Where used to find them).
- Select Save draft. The message Change order … saved. appears.
- Select Submit for approval (needs Permission:
manufacturing.eco.submit).
Fields
| Field | What to enter | Required |
|---|---|---|
| Title | A short name for the change. | "Enter a title". |
| Priority | Low, Normal, High or Urgent. | Normal. |
| Effective date | From when the new BOM versions apply. | "Choose the effective date". |
| Reason / Description | Why and what. | Optional. |
| BOM | Each affected BOM. | "Add at least one affected BOM". |
| Action / Component / New qty / New scrap % / Phantom | Each change. | "Describe at least one change"; an update must change something ("Change the quantity, scrap or phantom flag"). |
| Notes | Per affected BOM. | Optional. |
⚑ Approval
Submit for approval sends the change order to the approval workflow (document type Engineering change order). Rules in Approval rules can route it on priority, number of BOMs, number of changes or reason. Approvers act in Approvals. If no rule matches, it is approved at once.
Statuses
| Status | Meaning | What you can do next |
|---|---|---|
| Draft | Editable. | Save draft, Submit for approval, Cancel change order. |
| Pending approval | With the approvers. | Wait. |
| Approved | The banner says Approved. The new BOM versions take effect on …. Each affected BOM shows v… created with Open new version. | Wait for the effective date. |
| Implemented | The new versions are active (the daily job implements it on the effective date, or at once when the date has passed). | Read-only. |
| Rejected | The banner shows the approver's reason. | Revise brings it back to draft to change and resubmit. |
| Cancelled | No BOM version is created. | Read-only. |
Only draft and rejected change orders can be edited. See Documents and their states.
