Appearance
Cost roll-ups
Also known as
- cost rollup
- standard cost
- standard costing
- product costing
- cost estimate
- material cost
- labour cost
- overhead
- costed BOM
- cost update
A cost roll-up calculates the standard cost of every manufactured item from its BOM and routing, bottom-up through all levels, and keeps each calculation as a numbered version. Cost accountants run one, review it and apply it as the new standard cost.
Run a cost roll-up
- Open ManufacturingCost roll-ups.
- Select Run cost roll-up (needs Permission:
manufacturing.cost.rollup). - Set the Date (BOM versions effective on this date; default today).
- In Items, pick the items to roll up, or leave All make items (every item with an active BOM; make components are always included).
- Add Notes (for example "Quarterly review").
- Leave Apply as standard at once off to review the result first, or turn it on to apply it immediately.
- Select Run roll-up.
The message Roll-up CR-… calculated for … items. appears and the roll-up opens.
How the cost is built
| Element | Per unit |
|---|---|
| Material | Σ component quantity incl. scrap × component cost (the rolled-up cost of make components, else the catalogue standard, the current inventory cost or the purchase price). |
| Labour | (setup ÷ standard lot size + run time) × work centre labour rate. |
| Overhead | The same hours × overhead rate, or a % of labour (Costing). |
| Subcontract | The subcontract cost per unit of the routing. |
| By-product credit | Less the cost share carried by by-products. |
Statuses
| Status | Meaning | Next |
|---|---|---|
| Draft | Calculated, not used yet. | Review and apply. |
| Applied | The totals became the catalogue standard cost. | Read-only. |