Bill of materials
ManufacturingBills of materialsBill of materialsPermission:
manufacturing.bom.viewOpen in Roari ERP (new tab)Also known as
- new BOM
- edit BOM
- recipe
- formula
- process BOM
- components
- scrap factor
- phantom
- by-product
- co-product
The BOM page is where you build or read one version of an item's bill of materials: the header, the components, the by-products, and tabs for the multi-level structure, versions, where-used and cost.
Create a BOM
- Open ManufacturingBills of materials and select New BOM, or press Ctrl K and type
new bill of materials. - Pick the Item the BOM makes. A new BOM is the next version of that item.
- Choose the Type: Standard (quantities per output) or Formula (process) (percentages of a batch).
- For a standard BOM, enter the BOM quantity (the output the component quantities are for, usually 1). For a formula, enter the Batch size and Yield %.
- Pick the Routing (empty = the item's active routing), and the Effective from and Effective to dates if known.
- Under Components, select Add component for each line and fill in the columns (table below).
- Under By-products, add secondary outputs if the process yields any.
- Select Save draft. The message BOM … v… saved. appears.
Fields
| Field | What to enter | Required / default |
|---|---|---|
| Item | The item this BOM makes. | Required: "Choose the item this BOM makes". |
| Type | Standard or Formula (process). | Standard. |
| BOM quantity | Output the component quantities are for. | 1; "Must be greater than zero". |
| Batch size | Formula: input quantity of one batch. | Required for formulas. |
| Yield % | Formula: output per batch = batch size × yield. | 100; "Above 0 and at most 100". |
| Routing | The routing that makes the item. | The item's active routing. |
| Effective from / Effective to | When the version applies. | Set on activation; "Must be on or after the effective-from date". |
| Name | A label for the version. | Item and version. |
| Configurable | Components can depend on configurator options. | Off. |
| Notes | Engineering notes. | Optional. |
Components (at least one: "Add at least one component"):
| Column | What to enter |
|---|---|
| Component item | The part or material. |
| Component quantity | Quantity per BOM quantity. In a formula: % of batch; the percentages must add up to 100. |
| Scrap % | Expected loss, 0 to 99.99. MRP and costing plan quantity × (1 + scrap). |
| Phantom | A sub-assembly that is not stocked: its own components are issued instead. |
| Op | The routing operation that consumes it (backflushed when that operation is reported), or At output. |
| Only with option | Configurable BOMs: the component is used only with this option (Always otherwise). |
By-products: By-product item, Qty per batch and Cost share %. The shares together may carry at most 95 % of the cost; the main product carries the rest.
Activate a version
- Save your changes first (Activate is disabled while the form has unsaved changes).
- Select Activate, check the Effective from date and confirm.
The message … v… is active. appears. Overlapping active versions of the item end the day before; versions that start later become obsolete. Only one version is active on any date.
Change an active BOM
- Select New version to copy it into a new draft, change the draft and activate it from a date.
- Or raise a change order when the change needs approval; the approved ECO creates and activates the new version on its effective date.
Other actions: Obsolete stops new work orders and MRP from using a version, Delete draft removes an unused draft, and Create work order opens a new work order for an active version.
Explore the structure, versions and cost
| Tab | What it shows |
|---|---|
| Structure | Multi-level explosion for the Explode quantity: each component with level, Make / Buy / Phantom, Qty per, Total qty and extended cost, with Material (level 1) and Standard cost totals. |
| Versions | Every version of the item. Pick Compare from version and Compare to version to see components Added, Removed, Changed or the Same, with old and new quantities and scrap. |
| Where used | All BOM versions that use this item as a component. |
| Cost | The Current standard cost and the Cost roll-up history of the item. |
When saving is refused
| Message | Why |
|---|---|
| Formula percentages must add up to 100 (now …) | The component shares of a formula do not total 100 %. |
| By-products may carry at most 95% of the cost | Lower the cost shares. |
| The BOM structure is circular: … | A component's own BOM uses this item, directly or deeper down. |
| Only draft BOM versions can change their components; create a new version or an engineering change order | The version is active. |
| Only unused draft versions can be deleted; obsolete it instead | The version is used by work orders. |
Differences by role
- Viewing needs Permission:
manufacturing.bom.view; creating, saving, activating and new versions needPermission:manufacturing.bom.manage. Create work order needsPermission:manufacturing.work_order.create.